Most inquiries are responded to within two business days. However, some questions require further investigation or clarification.
To prepare for expected load growth due to the expansion of renewables in the area, Amprion installed 3M ACCR 470 kcmil (238 mm²) on a 400 kV line. Amprion has the largest EHV transmission system in Germany, which runs between Lower Saxony and the border to Switzerland and Austria. Amprion chose the conductor only after it passed a dozen tests, including strength and installation testing.
RTE, a wholly-owned subsidiary of EdF, is the transmission system operator of France. After intensive testing, including corona, strength, short circuit, resistance and thermal-mechanical testing, RTE installed 3M ACCR 1033 TW T-28 in close quarters near the Distré substation. The 400 kV line had become thermally limited and more capacity was needed for anticipated renewable energy sources.
Our dedicated technical team is here to help you approach your next project with confidence. Get in-depth product information, valuable application guidance, training options and more.