3M™ Cold Shrink QT III 7600 S 3G Series Termination Kit includes a skirted, 3 phase termination. It ensures a pliable, tight seal for tape shield, wire shield and UniShield® power cables. The conjunction of high dielectric constant material and sealing compounds allows the termination to withstand voltages of 5 to 35kV.
Each kit contains: One 3M™ Cold Shrink Silicone Rubber Breakout Boot Assembly, one 3M™ Cold Shrink Silicone Rubber Jacket Seal Assembly, three 3M™ Silicone Rubber Phase Rejacketing Sleeve Assemblies, three 3M™ Cold Shrink Silicone Rubber Termination Assemblies, one 3M™ Tinned Copper Ground Braid Assembly, three small 3M™ Constant-Force Springs, one large 3M™ Constant-Force Spring, eight strips of Scotch® Mastic 2230, one 3/4" (19.05 mm) roll of Scotch® Super 33+™ Vinyl Electrical Tape, one 1-1/2" (25.4-12.7 mm) roll of Scotch® Vinyl Electrical Tape Super 88, one roll of Scotch® Electrical Shielding Tape 24, one 3M™ Cable Cleaning Preparation Kit CC-2, three 1/2" x 10" (12.7 mm x 254 mm) strips of 3M™ EMI Copper Foil Shielding Tape 1181, and one Instruction Sheet.
3M industrial and occupational products are intended, labeled, and packaged for sale to trained industrial and occupational customers for workplace use. Unless specifically stated otherwise on the applicable product packaging or literature, these products are not intended, labeled, or packaged for sale to or use by consumers (e.g., for home, personal, primary or secondary school, recreational/sporting, or other uses not described in the applicable product packaging or literature), and must be selected and used in compliance with applicable health and safety regulations and standards (e.g., U.S. OSHA, ANSI), as well as all product literature, user instructions, warnings, and other limitations, and the user must take any action required under any recall, field action, or other product use notice. Misuse of 3M industrial and occupational products may result in injury, sickness, death, or property damage. For help with product selection and use, consult your on-site safety professional, industrial hygienist, or other subject matter expert.