| BACK TO START | Back to 11kV Inline Joints | |||||||
| Back to 11kV Poly Trif Joints | ||||||||
| Back to 11kV Trans Joints | ||||||||
| Back to 11kV Trans/Trif Joints | ||||||||
| ScottishPower Joint Accessories | ||||||||
| Kit Ref | Application & Range as applicable | CLICK TO VIEW↓ | ||||||
| 92-PG612-3 (BL) | Build Up for 95mm˛ Polymeric Loop and Branch Joints | Installation Instruction | ||||||
| 92-PG612-3 (95) | Build Up for 95mm˛ Polymeric Inline Joints | |||||||
| 92-PG612-3 (185) | Build Up for 185mm˛ Polymeric Inline Joints | |||||||
| 92-PG612-3 (300) | Build Up for 300mm˛ Polymeric Inline Joints | |||||||
| 92-PG611-3 | Build Up for 92-FV Series when joining 50/95mm˛ Paper Cables to 300mm˛ XLPE | Installation Instruction | ||||||
| PILCBL | Build Up for up to 50mm˛ PILC Cables within Branch and Loop Joints | Installation Instruction | ||||||
| PILCS0 | Build Up for Paper Insulated Belted or Screened 3 Core Cables 16 - 50mm˛ | Installation Instruction | ||||||
| SPM | Screened Paper Module for Straight, Trifurcating, and Pot End Joints | Installation Instruction | ||||||
| PM1 | Paper Module to allow Paper to Paper Belted or Screened 3 Core Joints <50-95mm˛ | Installation Instruction | ||||||
| PM2 | Paper Module to allow Paper to Paper Belted or Screened 3 Core Joints >95-300˛ | |||||||
| MV33EEK | Earth Rod Connection System for 11/33kV Single Core Cables | Installation Instruction | ||||||
| MEHV0 | Mechanical Earthing System PILC up to 35mm˛ | Installation Instruction | ||||||
| MEHV1 | Mechanical Earthing System PILC 50-95mm˛ | |||||||
| MEHV2 | Mechanical Earthing System PILC 120-300mm˛ | |||||||
| MEHV3 | Mechanical Earthing System PICAS 50-95mm˛ | Installation Instruction | ||||||
| MEHV4 | Mechanical Earthing System PICAS 120-300mm˛ | |||||||